Mechanical Technician (Topside/Hull) – FPU Conversion Project

A new offshore opportunity is available for an experienced Mechanical Technician (Topside/Hull) to join a major FPU conversion project. This role is suitable for mechanical professionals with practical experience in static mechanical equipment, topside and hull systems, offshore oil and gas facilities, FPSO/FPU projects, and shipyard or conversion environments.

The project will begin with an approximately three-month shore-based assignment in Turkey, followed by around eight months offshore. The offshore phase will operate on a 35 days on / 35 days off rotation, making this an attractive opportunity for technicians seeking international offshore experience.

Mechanical Technician – Project Overview:

The selected technician will support mechanical activities associated with the conversion and preparation of an FPU. Candidates should be comfortable working in industrial, shipyard, and offshore environments where mechanical equipment installation, inspection, maintenance, testing, and commissioning activities may be required.

The initial shore-based phase in Turkey is expected to last approximately three months. During this period, technicians may be involved in conversion-related activities, equipment preparation, mechanical inspections, installation support, and coordination with project teams at the shipyard.

Following completion of the shore-based phase, the successful candidates are expected to move offshore for approximately eight months.

Key Experience Required:

The employer is particularly interested in candidates with strong experience in the following areas:

  • Static mechanical equipment
  • Topside and hull mechanical systems
  • FPSO and FPU projects
  • Offshore oil and gas facilities
  • Shipyard projects
  • Vessel conversion projects
  • Mechanical installation and maintenance
  • Inspection, testing, and commissioning activities

Experience working on floating production facilities or major vessel conversion projects will be especially valuable. Candidates should have a good understanding of mechanical equipment and be capable of working safely and efficiently within demanding project environments.

Shore-Based and Offshore Work:

One of the key features of this position is the combination of shipyard-based and offshore work.

The project will initially be based in Turkey for approximately three months. This phase provides technicians with direct exposure to the FPU conversion process and associated shipyard activities.

After the shore-based phase, the role will transition offshore for approximately eight months on a 35/35 rotation. This means personnel will generally work for 35 days offshore followed by 35 days off, subject to the project’s operational requirements.

This structure can provide valuable international experience for mechanical technicians who want to strengthen their offshore oil and gas background.

Accommodation and Food Provided:

The project provides accommodation and full board during both the shore-based assignment and the offshore phase. This can make the opportunity particularly attractive for candidates travelling internationally for the project.

Candidates should, however, confirm the complete employment package, travel arrangements, offshore allowances, insurance, and other contractual conditions directly with the recruitment contact before accepting an offer.

Candidate Preference:

Due to the project’s mobilisation and visa timelines, there is currently a preference for EU and UK candidates.

Applicants from these regions may have an advantage because of the project’s expected mobilisation schedule and visa requirements. Candidates who already have relevant work authorization or the ability to mobilise quickly should clearly mention this when submitting their CV.

How to Apply?

Experienced Mechanical Technicians who match the requirements can submit their updated CV for a confidential discussion.

Email: ross.thomson@ablyresources.com

When applying, candidates should highlight their experience with FPSO/FPU projects, static equipment, topside/hull systems, offshore oil and gas, shipyard work, and vessel conversion projects. It is also useful to clearly state previous offshore assignments, project locations, rotation experience, certifications, and availability for mobilisation.

This opportunity could be particularly relevant for mechanical technicians who have worked on floating production units, ship conversion projects, offshore facilities, or large-scale oil and gas construction and maintenance projects.

Candidates are encouraged to review the requirements carefully and ensure their CV accurately reflects their relevant project experience before applying. Recruitment and project requirements can change according to mobilisation schedules, so applicants should confirm the latest details directly with the recruitment contact.

Application Contact: Ross Thomson
Email: ross.thomson@ablyresources.com

This is an opportunity for experienced mechanical professionals to contribute to a major FPU conversion project while gaining further exposure to both shipyard and offshore oil and gas operations.

Leave a Comment